ABC classification abnormal demand action message action report flag activity-based costing actual capacity actual cost adjust-on-hand alternative routine anticipated delay report assembly order assembly parts list automatic rescheduling available inventory available material available work available-to-promise average inventory back order back scheduling backflush backlog balance-on-hand inventory batch number batch production benchmarking bill of labor bill of lading bill of material BPR branch warehouse business plan business process reengineer capacity management capacity requirements planning carrying cost carrying cost rate cellular manufacturing change lot date change route change structure check point closed loop MRP common route ID computer-integrated manufacturing configuration code constraints management costed bill of material critical part CRP cumulative lead time current run hour current run quantity cycle counting date adjust date available date changed date closed date due date in produced date inventory adjust date obsolete date received date released date required date to pull dead load demand management demonstrated capacity dependent demand direct-deduct inventory transaction processing disbursement list dispatch list distribution resource planning DRP drum-buffer-rope economic order quantity engineering change effect date engineering change effect work order engineering stop date EOQ exception control excess material analysis expedite code fabrication order fill backorder final assembly lead time firm planned order fixed order quantity flow shop focus forecasting full pegging generally accepted manufacturing practices gross requirements in process inventory independent demand input/output control inspection ID interplant demand inventory carry rate inventory location type inventory turnover issue order item item record JIT job shop just-in-time kanban labor hour last shipment date lead time line item load leveling load report location code location remarks location status lot for lot lot ID lot number lot size low level code machine capacity machine loading make or buy decision make-to-order product make-to-stock product manufacturing cycle time manufacturing resource planning master production schedule material cost material issues and receipts material requirements planning MPS MPS book flag MRP multiple location net change MRP net requirements new parent no action report on-hand balance open order order entry order point order policy order promising order remarks part bills part lot part number pegging picking picking list planned order post-deduct inventory transaction processing pre-deduct inventory transaction processing price invoice price purchase order priority planning product control production line production planning production rate production tree projected available balance purchase order tracking quantity allocation quantity at location quantity backorder quantity completion quantity demand quantity gross quantity in queue time regenerated MRP rescheduling assumption resource requirements planning rough-cut capacity planning routing safety stock safety time scheduled receipt scrap factor send part service parts ship address ship contact ship date ship order shop calendar shop floor control shrinkage factor standard product cost standard set up hour standard unit run hour standard wage rate status code stores control suggested work order theory of constraints time bucket time fence TOC unit cost vendor scheduler vendor scheduling work center work center capacity work in process work order work order tracking work scheduling zero inventory